Advertisement

Why is the I-75/I-24 split so bad?

The I-75/I-24 split went through it’s first modifications in six decades over 2019-2021. New planned construction is meant to eliminate the bottleneck for good.

The Interstate 75/Interstate 24 interchange in the early 1960s. It was completed before I-24 West connected to Belvoir Avenue heading toward Chattanooga.

Glad you asked this. (William here, by the way.) When I moved to Chattanooga a year ago, I was truly baffled by the route into town. A slow-moving convoy of brake lights led north as traffic jostled for position on the ramp from Interstate 75 to Interstate 24. “Why?” was a repeated refrain in my head as the two-lane exit dwindled to one. “Who did this?”

For this question, I looked through newspaper archives and TDOT documents going back to the 1960s. I got some answers — although they weren’t especially satisfying — but was pleased to find out there’s hope on the horizon.

While the split may seem like poor road design, it created less of a traffic headache when state and local officials opened the interchange in 1961. Back then, there were only 1.7 million licensed drivers in the State of Tennessee compared to more than 5 million roaming Tennessee’s highways and byways today.

Fast forward 60 years to when the state completed phase one of a two-part reconstruction project. Despite how it may feel, traffic flow at the I-75 to I-24 split has actually improved. According to the American Transportation Research Institute (ATRI), construction projects from 2019-2021 boosted average vehicle speeds by 12% through the interchange (up to 52 MPH on average) in 2022.

Now, the split is ranked No. 59 on the ATRI’s list of the country’s 100-worst trucking bottlenecks. While that’s not a badge of honor, it’s a far cry from the 7th-worst spot the split earned amid construction in 2021.

Major construction on I-75/I-24 overseen by TDOT is set to continue this fall, and phase two makes big promises. Plans call for three-lane on-ramps from both I-75 North and I-75 South to I-24 West, effectively doubling the size of I-24 W at the split. I-24 in both directions will grow to four lanes, and I-75 N toward East Brainerd Road will expand as well.

TDOT expects the full expansion to wrap up by late 2025 and ultimately free up the bottleneck for good.


Email william@chattamatters.com with any additional questions about the split or anything else in Chattanooga.

Advertisement
Advertisement
Author

William is an award-winning journalist and editor focused on communicating important topics in a way that’s accessible to everyone. He served as a writer and producer for Chattamatters from 2022 to 2026.

Before coming to Chattanooga, he received his master’s degree from the University of Georgia and wrote for his hometown paper, the Atlanta Journal-Constitution.